Mangatoetoe Bridge Abutment

Constructed in only 24 hours, the Ecoreef system was utilised to construct an abutment surrounding the exposed piles of this bridge. With long interlocked wing walls and a large stable footprint this abutment has been designed to protect the bridge from erosion during flooding events.